MA'ADEN Reactor Transport & Setting

Heavy haulage and erection of industrial reactors in Ras Al Khair.

November 2025 Ras Al Khair
MA'ADEN Reactor Transport & Setting

Project Overview

A comprehensive logistics and erection project involving moving a 480-tonne chemical reactor from the port of Ras Al Khair to the MA'ADEN industrial site, followed by precision vertical erection.

Key Challenges

01

Heavy load transport across 12km of highway and refinery gates.

02

Overhead power lines and utility crossings requiring temporary shutoffs.

03

Executing the horizontal-to-vertical tailing lift safely.

Execution & Methodology

  • Configured a 16-axle line SPMT trailer with wireless control.
  • Designed and simulated the tailing lift using a 750T crawler and a 400T mobile crane.
  • Prepared road compaction zones at critical turns.

Results & Achievements

  • Successfully transported reactor through all refinery gates without incident.
  • Erected and bolted turbine in a single day under master supervision.
  • Demonstrated outstanding multi-axle logistics coordination.

Project Details

Location
Ras Al Khair, Saudi Arabia
Client
MA'ADEN Phosphate Company / EPC Contractor
Duration
25 Days
Equipment Used
16-line SPMT (Self-Propelled Modular Transporter) & LR 1750
Date
November 2025

Have a Similar Project?

Connect with our lift engineers today to receive a detailed lift study or custom commercial proposal.