Dammam Power Plant Lift

Lifting and positioning heavy gas turbine blocks into foundations.

December 2025 Dammam
Dammam Power Plant Lift

Project Overview

This project involved the unloading, transport, and foundation setting of a heavy gas turbine unit weighing 380 metric tonnes at the Dammam Power Plant extension site.

Key Challenges

01

High value and sensitive nature of turbine components.

02

Precise alignment requirement on foundation bolts with sub-millimeter tolerances.

03

Restricted headroom within the power plant hall structure.

Execution & Methodology

  • Designed a custom lifting yoke to level the asymmetric turbine weight.
  • Utilized hydraulic gantry systems and a 600-tonne crawler crane.
  • Performed mock-up runs to test crew synchronization.

Results & Achievements

  • Turbine set to 0.1mm alignment accuracy.
  • Eliminated structural risks through specialized rigging design.
  • Direct commendation from SEC plant manager.

Project Details

Location
Dammam, Eastern Province, Saudi Arabia
Client
Saudi Electricity Company (SEC) / Doosan Heavy Industries
Duration
15 Days
Equipment Used
LR 1600/2 (600T Crawler Crane)
Date
December 2025

Have a Similar Project?

Connect with our lift engineers today to receive a detailed lift study or custom commercial proposal.