Red Sea Resort Steel Erection

Precision crane operations on pristine coastlines with strict environmental rules.

February 2026 Red Sea Project
Red Sea Resort Steel Erection

Project Overview

BM Cranes provided operated crane hire for structural steel canopy installations at luxury resort villas on the Red Sea coast, requiring extreme caution for marine habitats.

Key Challenges

01

Pristine environmental restrictions with zero spill tolerance.

02

Salty, corrosive coastal winds.

03

Sensitive sand surfaces demanding careful load distribution.

Execution & Methodology

  • All crane units pre-inspected for fluid leaks with bio-degradable oils used.
  • Large lightweight outrigger pads deployed on stabilized sandy bays.
  • Daily weather monitoring to handle coastal wind surges.

Results & Achievements

  • Successfully installed 12 resort canopy structures.
  • Zero environmental impact or chemical spills.
  • Helped the client achieve high LEED/green building compliance.

Project Details

Location
Red Sea Project, Saudi Arabia
Client
Red Sea Global
Duration
30 Days
Equipment Used
200T Mobile Crane (Demag AC 200)
Date
February 2026