Project Overview
BM Cranes provided operated crane hire for structural steel canopy installations at luxury resort villas on the Red Sea coast, requiring extreme caution for marine habitats.
Key Challenges
01
Pristine environmental restrictions with zero spill tolerance.
02
Salty, corrosive coastal winds.
03
Sensitive sand surfaces demanding careful load distribution.
Execution & Methodology
- All crane units pre-inspected for fluid leaks with bio-degradable oils used.
- Large lightweight outrigger pads deployed on stabilized sandy bays.
- Daily weather monitoring to handle coastal wind surges.
Results & Achievements
- Successfully installed 12 resort canopy structures.
- Zero environmental impact or chemical spills.
- Helped the client achieve high LEED/green building compliance.