NEOM Tower Structure Installation
Lifting structural steel sections in remote, high-altitude desert terrain.
March 2026 NEOM

Project Overview
BM Cranes mobilized high-capacity crawler crane units to remote mountains in NEOM to erect complex structural steel frames for premium commercial and resort tower units.
Key Challenges
01
Remote location requiring self-sufficient mobile workshops and fuel logistics.
02
Strong desert wind gusts changing dynamically.
03
Steep gradients demanding specialized track pads and load-bearing soil platforms.
Execution & Methodology
- Utilized real-time weather stations and anemometers on crane booms.
- Engineered specialized ground-mats to spread heavy crawler ground pressures.
- Mobilized operators, riggers, and lift managers in a fully integrated camp.
Results & Achievements
- Successfully erected over 4,500 tonnes of structural steel.
- Zero equipment downtime despite harsh desert conditions.
- 100% incident-free safety record over the entire mobilization.
Project Details
Location
NEOM, Tabuk Region, Saudi Arabia
Client
NEOM Development Partners / El Seif Engineering
Duration
60 Days
Equipment Used
Terex Superlift 3800 (650T Crawler Crane)
Date
March 2026